page header
Home Contact Us Calendar of Events DOL Publications Statistics About NCDOL Informational Links Site Map Search our Site

   


Bureau of Compliance

Operational Procedure Notices

An Operational Procedure Notice (OPN) is a state-specific OSHNC operating procedure which may clarify or replace a federal OSHA compliance directive (CPL). An OPN may also be written in the absence of a federal OSHA compliance directive.

These documents were originally used as temporary operating procedures until the Field Operations Manual (FOM) was updated. The FOM was updated to include most of the OPNs in 2000. At that time many of the existing OPNs were canceled. The FOM is now maintained in electronic format, therefore updates to permanent operating procedures are made directly to the FOM in lieu of creating new OPNs. The OPNs listed below are special emphasis programs or temporary operating procedures.

To be certain you have the most current OPN, please check this page frequently or bookmark this page for use instead of printing each document. The title is linked to the document. Adobe Acrobat Reader 6.0 may be necessary to view these files.

 

OPN # Title Date
88F Special Emphasis Program: Tree Felling and Related Activities 03/17/09
91A Delegation of Authority to Issue Citations 05/27/11
95H Special Emphasis Program: Reinspection of Employers After a Fatality 11/07/11
96D Focused Inspections in Construction 02/01/12
101D Third Party Litigation 06/27/11
107A Right to Know Act 04/24/00
109C Interim Fall Protection Requirements for Residential Construction 05/21/12
116E Special Emphasis Program: Chemical Hazards on Farms 03/13/13
118B Variances 07/09/10
121D Steel Erection 06/10/10
122D Special Emphasis Program: Communication Towers 06/15/10
123N Special Emphasis Program: Construction Activities 11/06/12
124V Special Emphasis Program: Site Specific Targeting 01/24/13
127 Respirator Use Policy Under the Cotton Dust Standard 03/27/02
128M Special Emphasis Program: Public Sector Targeting (See also FOM Chapter II) 08/13/12
129A Interim Inspection Procedures for Blasting Operations in Construction 05/03/10
130B Emergency Action Plans and Fire Prevention Plans 06/23/08
132E Special Emphasis Program: Long Term Care Facilities 06/21/12
133E Special Emphasis Program: Sawmills, Veneer, Manufactured Home (Mobile Home) and Other Wood Products Manufacturing Injury and Illness Reduction 04/27/10
135F Special Emphasis Program: Exposure to Health Hazards 01/04/12
136A Personal Protective Equipment for Construction 05/27/11
140B Special Emphasis Program: Food Manufacturing Facilities 03/16/11
141 Heat-related Illness Inspections 03/15/12
142A Expedited Informal Settlement Agreements 02/07/13

 

page ender

Home | Contact Us | Calendar | Publications | Statistics | About Us | Links | What's New | Site Map | Search
Privacy Policy | Disclaimer | Mission Statement

1101 Mail Service Center • Raleigh, NC 27699-1101 •  919-807-2796 or 800-NCLABOR