|
|
Occupational
Safety & Health
|
BUREAU OF COMPLIANCE
COMPLIANCE DIRECTIVES
Compliance (CPL) directives are federal compliance operating procedures which relate to enforcement of particular standards. The CPL's listed below are the only federal CPL's that OSHNC uses. State-specific operating procedures are contained in additional documents; the Field Operations Manual (FOM) and Operational Procedure Notices (OPN).
Federal OSHA recently renumbered their directives using a new classification scheme. The document number listed first is the old CPL number and appears on the PDF and HTML versions of the documents created prior to October 2003. The number listed second (in brackets) is the new CPL number which may appear on federal OSHA's table of contents and will also appear in the HTML versions of the documents created prior to October 2003 and in all documents created since October of 2003. To be certain you have the most current information, please bookmark this page and check the OSHNC date occasionally. The title is linked to the document on either the federal OSHA website or the NCDOL website. Adobe Acrobat Reader 6.0 may be required to view some of these documents.
Adobe Acrobat Reader 6.0 may be required to view some of these documents.
![]()
CPL # Title OSHNC Date 1-0.3
[01-00-003]Nationally Recognized Testing Labs 12/2/99 2 (03-03) Extension of Enforcement Policy on Column Joists (CPL 2-1.34) Canceled 2 (03-10) Audit and Verification Program 12/01/03 2 (04-02) Site Specific Targeting
(OPN 124 supplements this CPL)Canceled 2 (05-05) Site Specific Targeting
(OPN 124 supplements this CPL)10/09/05 2.2
[02-00-002]American Red Cross Agreement 10/30/78 2.69
[02-00-069]Trenching and Excavations 09/19/85 2.73
[02-00-073]Fireworks Manufacturers 02/03/86 2.77
[02-00-077]Fatality/Catastophe Investigations 12/30/86 2.78
[02-00-078]Regional Ergonomics Program 02/09/87 2.78 CH-1
[02-00-078]Regional Ergonomics Program 07/08/87 2.86
[02-00-086]Memorandum of Understanding btw. OSH and NRC 12/22/89 2.87
[02-00-087]Excavations 2/20/90 2.95
[02-00-095]Enforcement Authority at DOE Sites 02/10/92 2.98
[02-00-098]Case File Documentation for Videotapes and Audiotapes 10/12/93 2.100
[02-00-100]Confined Spaces 05/05/95 2.106
[02-00-106]Tuberculosis 02/09/96 02-00-051 Appropriations Act Exemptions & Limitations
(updated Appendix A effective 12/30/04)05/28/98 2-0.102A
[04-00-001]Local Emphasis Programs 11/10/99 2-0.120
[02-00-120]Respiratory Protection 09/25/98 2-0.124
[02-00-124]Multi-Employer Workplaces 12/10/99 2-0.125
[02-00-125]Home-Based Worksites 2/25/00 2-0.131
[02-00-131]Recordingkeeping Policies and Procedures Manual Canceled 02-00-132 Longshoring and Marine Terminal "Tool Shed" Directive 04/30/04 02-00-133 Shipyard "Tool Bag" Directive 04/30/04 02-00-135 Recordingkeeping Policies and Procedures Manual 12/30/04 2-1.4C
[02-01-014]Grain Handling Facilities 11/08/96 2-1.14B
[02-01-014]Alloy Steel Chain Slings - Proof Testing 10/01/81 2-1.15A
[02-01-015]Meat Tenderizing 12/23/81 2-1.23
[02-01-023]Scaffolds Used in Construction 01/07/97 2-1.25
[02-01-025]Point of Operation Guarding for Power Press Brakes 02/14/97 2-1.28A
[02-01-028]Powered Industrial Trucks 11/20/00 2-1.29
[02-01-029]Communication Towers
(OPN 122 supplements this CPL)Canceled 2-1.30
[02-01-030]Chocking Tractor Trailers 10/19/99 2-1.34
[02-01-034]Steel Erection
(CPL 02-01-040 and OPN 121 supplement this CPL)
7/22/03 2-1.36 Communications Towers
(OPN 122 supplements this CPL)09/23/05 2-1.38
[02-01-038]Electric Power Transmission and Distribution 05/07/04 2-1.39
[02-01-039]Enforcement of Cargo Gear Regulations and the Requirements for Gear Certification in the Maritime Program 04/30/04 02-01-040 Enforcement Policy on Column Joists
(This directive supplements CPL 2-1.3411/08/04 2-2.30
[02-02-030]Review of Medical Opinions 11/04/80 2-2.31
[02-02-031]Cotton Dust Manual 01/16/81 2-2.31 CH-1
[02-02-031]Cotton Dust Manual 06/03/85 2-2.32
[02-02-032]Review of Specific Medical Records 01/19/81 2-2.33
[02-02-033]OSHA Access to Employee Medical Records 02/08/82  2-2.38D
[02-02-038]Hazard Communication 03/20/98 2-2.45A
02-02-045]Process Safety Management 11/01/94 2-2.45A CH-1
[02-02-045]Process Safety Management 11/01/94 2-2.46
[02-02-046]Medical Records Review 01/05/89 2-2.51
[02-02-051]Post Emergency Response Operations 11/05/90 2-2.52
[02-02-052]Formaldehyde 10/07/91 2-2.52 CH-1
[02-02-052]Formaldehyde 11/20/90 2-2.53
[02-02-053]First Aid Programs 01/07/91 2-2.58
[02-02-058]Lead in Construction 12/13/93 2-2.59A
[02-02-059]Hazardous Waste Operations and Emergency Response 04/24/98 2-2.6
[02-02-006]Inorganic Mercury 10/30/78 2-2.6 CH-1
[02-02-006]Inorganic Mercury 06/03/85 2-2.63 Rev.
[02-02-063]Asbestos 11/03/95 2-2.63
[02-02-063]Asbestos 01/09/96 2-2.66
[02-02-066]1,3-Butadiene 10/30/97 2-2.67
[02-02-067]Lead: Brass and Bronze Ingot Manufacturing 02/27/97 2-2.69
[02-02-069]Bloodborne Pathogens 11/27/01 2-2.7
[02-02-007]Crystalline Silica 10/30/78 2-2.7 CH-1
[02-02-007]Crystalline Silica 06/30/85 2-2.70
[02-02-070]Methylene Chloride 12/14/01 02-02-071 Hazardous Waste Site and RCRA Corrective Action Clean-up Operations 06/01/04
![]()
Mailing Address: 1101 Mail Service Center, Raleigh, N.C. 27699-1101 (919) 807-2796 or 1-800-NCLABOR. Physical Address: 4 W. Edenton Street, Raleigh, N.C. This page last modified 10/24/05 |